Workspace
Refurbishment of the management floors
Services
- Build
- Design
Details
- Our mission: Think, design and build
- Area: 2000m2
Description
Phase 1 or Elia’s main building, refurbishment of the management floors in a way to match the NWOW concept and offering major flexibility within the workplace strategy into place.
The refurbishment of the different areas of the existing headquarters of Elia demanded a highly competent team.
The assurance and assistance of different disciplines and multiple POC and decision makers was essential for the good coordination and execution of the project.
High technical requirements within the real estate asset and throughout the design process and execution (TV and radio studios and security areas among others) were key to the achievement of this project.
High quality execution within a concept that offers warmth, efficiency and adjustability are fundamental for the future of Elia’s well balanced office environment.